Connect with us

Broadband Mapping & Data

Native Americans Need Control Over Mapping Data, Conference Hears

Indigenous connectivity advocates said Native Americans should have control over their mapping data.

Published

on

Traci Morris, executive director of the American Indian Policy Institute at Arizona State University.

October 18, 2021––Advocates for greater broadband access in Native American lands discussed the need for greater control over broadband mapping to address broadband challenges amongst Native American populations.

Traci Morris and H. Rose Trostle from the American Indian Policy Institute said Wednesday at the Indigenous Connectivity Summit that there is now an intense focus on “broadband inequality and digital equity” as it relates to Tribal nations.

Morris and Trostle’s indigenous-led office at Arizona State University analyzes policy recommendations on key issues in Indian country, and they’re working on a paper that would overview Indian country in the U.S., federal broadband maps, and a consideration of indigenous “data sovereignty”­­––the argument that native lands should have more control over their data mapping to improve broadband mapping in tribal lands.

The mapping undertaking is particularly important to Trostle. “Indigenous peoples have a long tradition of mapping,” they said. “This needs to be recognized when considering how we can improve modern maps of key services, including electricity, water, and broadband.”

Trostle underscored the gap in adequate broadband mapping between tribal lands and the rest of the United States. “Indian country is the canary in the coal mine of broadband mapping,” Trostle said. “Federal data has problems for not just tribal lands, but also non-tribal rural and urban areas.” In Trostle’s view, part of the problem is “a lack of people that understand broadband or tribal lands.” Trostle said their office’s study on the inadequacy of broadband mapping on tribal lands would be available “within the next year.”

The Indigenous Connectivity Summit also featured a discussion about indigenous data sovereignty.

Jeff Doctor, impact strategist at Animikii Indigenous Tech, argued that the native American individual’s connection with their larger collective cultural group makes their data more personal in nature and should be better protected.

In tribal lands, political belonging has an influence on their community and culture and “has a part in how we think of collective rights,” he said. Doctor described how native American lands have been disadvantaged by the U.S. government.

“When you look at how colonialism operates, it’s very extractive” he said. He urged summit attendees to think about how to build rights-based technology. He suggested taking a community-centralized approach to data rights and molding tech data policy around universal human rights.

The fifth annual Indigenous Connectivity Summit held virtual sessions from October 12 to October 15, 2021. They met each year to discuss how Tribal nations can have affordable, quality, and sustainable internet access, and talk about how connectivity supports social and economic development.

Reporter Justin Perkins is graduate of Howard University School of Law, with a focus on telecommunications and technology. He has in-house experience at the Federal Communications Commission, Comcast and NBC. He brings curiosity and insight to broadband news.

Continue Reading
Click to comment

Leave a Reply

Broadband Mapping & Data

Jeff Miller: Tools to Manage the Next-Generation Network Buildouts

Service providers that use GIS applications are able to reduce design time by 80 percent.

Published

on

The author of this expert opinion is Jeff Miller, Synchronoss Technologies CEO.

Today’s digital world is driving the insatiable need for fiber networks and connectivity, thus the thrust for widespread broadband buildouts and deployments worldwide. Broadband connectivity is the heartbeat for mobility, cloud applications, voice, video, and social media, not to mention home automation, IoT, and smart cities. As a result, service providers and operators are investing heavily in infrastructure, claiming their 5G networks are the largest or fastest or most reliable.

Initiatives like the Rural Digital Opportunity Fund are aimed at bridging the digital divide and fast-tracking investment to deploy high speed fixed broadband service to rural areas and small businesses that lack it. The Federal Communications Commission’s $20.4 billion program requires that networks stand the test of time by prioritizing higher network speeds and lower latency.

A key element in the implementation of RDOF-backed projects is broadband mapping. The Federal Communications Commission is in the process of updating its current broadband maps with more detailed and precise information on the availability of fixed and mobile broadband services. The Broadband Deployment Accuracy and Technological Availability Act, signed into law in March 2020, requires the FCC to change the way broadband data is collected, verified, and reported

As carriers build, expand, and upgrade their fiber network infrastructure, a great deal of planning is required, along with documenting the intricacies of design and engineering processes.

Streamlining and automating network planning and design processes through software can deliver accurate and timely network info for service providers, increase efficiency, and create opportunities for reducing costs.

GIS based systems are replacing volumes of paper, and outdated static CAD, Excel and Vizio files. They offer sophisticated tools to manage all aspects of network design and infrastructure management. Working with many service providers that use GIS applications, they are able to reduce design time by 80 percent and drastically cut other capital expenditures.

Automation is key

Having to rely on a system of manual processes to manage the fiber network makes it increasingly difficult to scale. Fortunately, with the introduction of automation into the network management process by utilizing an accurate physical network inventory in addition to geographic information system mapping, scalability becomes a much easier task.

Continuous planning and engineering tasks can ultimately become automated through software implementation. Automating network fiber management creates significant business value by shifting a service provider’s approach from reactive to proactive. A comprehensive and updated database for network architecture quickly allows for scenario analysis and capacity planning. Sharing automated processes across different organizations becomes much simpler and improves collaboration while reducing errors. This can allow staff to shift their focus to more pressing operational activities thus making the network more reliable.

Integration between different systems

Whether it is your enterprise GIS or outage monitoring system, it should be easy to interact with third-party systems to get the most out of the network data. Ideally, you should be able to receive an outage notification and use that location to track down the network and pinpoint the root cause to act and quickly resolve the situation before customers notice. This can help save time, money, and guarantee customer satisfaction.

Mobilize network data and increase field worker productivity

Utilizing a fiber networking and planning solution enables network information to be shared easily and quickly between the field and office to provide access to the information they need when they need it at any given time. Enterprise-wide access can provide timely and accurate network information for a wide range of communications service providers.

When it comes to service providers, expanded visibility into a network yields a greater overall awareness of the network. Automating third-party data exchange processes with accurate and up-to date inventory can optimize performance for field workers and guarantee customer satisfaction. Improved access to data can increase ROI by allowing cable locators and field techs to receive accurate confirmation before they arrive at a job. In the end, there will be fewer mistakes which ensures happier customers.

The right tools can result in improved scalability, reduced time to revenue, lower operational costs, and actionable insights that can be gleaned from network data.

Jeff Miller serves as President and CEO of Synchronoss Technologies. He previously served as President for IDEAL Industries Technology Group, following a 16-year experience with Motorola Mobility where he was Corporate Vice President of North America. Miller also serves on the Board of 1871, Chicago’s largest start-up incubator, and on the non-profit Boards of Aspire Chicago and Junior Achievement. This article is exclusive to Broadband Breakfast.

Broadband Breakfast accepts commentary from informed observers of the broadband scene. Please send pieces to commentary@breakfast.media. The views reflected in Expert Opinion pieces do not necessarily reflect the views of Broadband Breakfast and Breakfast Media LLC.

Continue Reading

Broadband Mapping & Data

States Face Roadblocks in Challenge Processes, FCC Tries to Facilitate

The BEAD timeline looms large for many who worry that two months is insufficient time to correct the map.

Published

on

Photo of Kirk Burgee, chief of staff for the FCC's Wireline Competition Bureau

WASHINGTON, November 30, 2022 – As state broadband offices scramble to submit challenges to the national broadband map, the Federal Communications Commission is working to provide much-needed resources to help stakeholders through the often-opaque challenge processes.

The FCC’s new broadband map, released in November, provides location-level data of broadband availability nationwide. The map is comprised primarily of two datasets: a list of all broadband serviceable locations – the “fabric” – and provider-submitted availability data. The accuracy of both can be challenged by the public through designated processes.

The FCC has endeavored to create a consumer-friendly challenge-process, said Kirk Burgee, chief of staff for the Wireline Competition Bureau. “We do try to make the process as flexible and accessible as it can be consistent with getting effective challenges and resolving them correctly,” he explained.

Burgee spoke at an FCC webinar held Wednesday to demystify the fixed-availability bulk-challenge process.

The FCC’s availability data will largely determine the distribution of the $42.45 billion Broadband Equity, Access, and Deployment program among the states. The National Telecommunications and Information Administration, the subdivision of the Department of Commerce which administers the BEAD funds, has advised the public to submit challenges by January 13, 2022, to ensure they are considered for BEAD grants – scheduled to be announced in June.

The immediate stakes of accurate mapping

If the FCC’s data is inaccurate when the NTIA calculates the allocations, some states could be shorted on badly needed funding. Some industry players say the map is concerningly inaccurate, and others say the FCC’s challenge processes may prove prohibitively complex.

Georgia has yet to submit fabric challenges, although it intends to, wrote Joshua Hildebrandt, the state’s director of broadband initiatives, in correspondence with Broadband Breakfast.

“So far, we have encountered a number of hurdles that have made a quick challenge submission difficult to do,” Hildebrandt explained. “Georgia is fortunate to have a considerable amount of data, which helped us create one of the nation’s first public statewide address-level broadband service maps.

“However, even with all of this applicable data in-house,” he added, “The FCC’s process for challenging fabric locations on a one-by-one basis still requires substantial effort and time.”

“The fabric is an enormous challenge, but we are very disappointed in the quality of the fabric and, more importantly, the insistence on using it and moving forward,” David Lukens, Connecticut’s broadband-mapping coordinator, told Broadband Breakfast.

“The FCC’s burdensome challenge process incentivizes…challenges focused only on potential BEAD project area,” he added.

Several state broadband officials told Broadband Breakfast that they have, by necessity, thus far submitted fabric challenges primarily for unserved areas, leaving the FCC’s data for numerous locations in better-served areas uncorrected. Some say, however, that they will submit additional challenges going forward.

The challenge process may work, but some say time is running short for BEAD

Spokespeople for the FCC and CostQuest have routinely acknowledged the errors in the map’s first draft and urged stakeholders to submit challenges to correct them. Some experts, including Scott Wallsten of the Technology Policy Institute, say inaccuracies are inevitable, but the challenge process will largely ameliorate them in time.

The BEAD timeline looms large for many who worry that less than two months – the interval between the map’s November release and January 13 – is insufficient time to correct the map. And like any massive undertaking, smaller entities struggle to keep up.

Kansas’ broadband director, Jade Piros de Carvalho, told Broadband Breakfast her small team lacks the bandwidth to submit a bulk challenge at all. Piros de Carvalho has encouraged her fellow Kansans to submit their own challenge. “Currently the FCC shows KS at about 5 percent unserved. We are more likely closer to 15 percent unserved, and that difference will have a direct negative impact on the dollars we receive,” she wrote Monday.

Maine will take a multi-stakeholder approach that will mobilize communities and regional partners, Andrew Butcher, president of the Maine Connectivity Authority, told Broadband Breakfast. In addition, the state itself plans to submit bulk-availability and fabric challenges by January 13, Butcher said.

Continue Reading

Broadband Mapping & Data

Right Track or Wrong Track on Mapping? Panel 2 at Digital Infrastructure Investment

Panel 2 video. Join the Broadband Breakfast Club to watch the full-length videos from Digital Infrastructure Investment.

Published

on

Video from Panel 2 at Digital Infrastructure Investment: Moderated by David McGarry, Reporter, Broadband Breakfast, with Bryan Darr, Executive Vice President of Smart Communities, Ookla, Mike Conlow, Director of Network Strategy, Cloudflare, and Jim Stegeman, President, CostQuest Associates.

For a free article summarizing the event, see ‘It Is a Concern’: FCC Contractor Responds to Commercial Conflict Concerns Over Map Challenge Process: CostQuest’s CEO said states need to look at their vendors if they pose a problem challenging FCC map data, Broadband Breakfast, November 17, 2022

Access Premium content for Broadband Breakfast Club members. Login to your account below. Or visit Broadband Breakfast Club to signup.

Continue Reading

Signup for Broadband Breakfast

Get twice-weekly Breakfast Media news alerts.
* = required field

Broadband Breakfast Research Partner

Trending